Ardex K15 Rapid Drying Self Levelling Smoothing Compound extended information
Coverage: Approximately 5.25m2 at 3mm thick per 22kg bag
USE
ARDEX K 15 will level and smooth, in a single application, most known uneven internal sub-floors including concrete, cement/sand screeds, porcelain, ceramic, quarry tiles and anhydrite screeds etc. prior to the installation of floorcoverings.
Applications include smoothing tamped, uneven, damaged or rained-on in-situ concrete sub-floors, adjusting tolerances or camber problems between floors, slabs or pre-cast concrete, as well as smoothing old sub-floors and screeds in renovation projects.
ARDEX K15 Rapid Drying Self Levelling Compound technical data
ARDEX K15 TECHNICAL DATA | |
---|---|
Bulk density of powder | approx. 1.1kg/litre |
Weight of fresh mortar | approx. 1.8kg/litre |
Working time at 20°C | approx. 30 minutes |
Flow life at 20°C | approx. 15 minutes |
Initial Set (Vicat) | approx. 30 minutes |
Final Set (Vicat) | approx. 2 hours |
Compressive Strength (EN196) | |
After 1 day | 19 N/mm2 |
After 3 days | 22 N/mm2 |
After 7 days | 28 N/mm2 |
After 28 days | 35 N/mm2 |
Tensile Bending Strength (EN196) | |
After 1 day | 4.5 N/mm2 |
After 3 days | 5.8 N/mm2 |
After 7 days | 6.0 N/mm2 |
After 28 days | 9.0 N/mm2 |
Suitable for underfloor heating | Yes |
SURFACE PREPARATION
The surface must be hard, sound, free of dust, dirt and other barrier materials such as grease, paint, adhesive residues or loosely adhered materials, etc. In all cases where traces of adhesive residues are present these must be sound, well adhered and unaffected by water.
NOTE: For internal use only.
Direct to earth sub-floors must have an effective damp proof membrane. If the damp proof membrane is absent or damaged, or the substrate is damp, please consult the ARDEX DPM, ARDEX DPM 1 C or ARDEX DPM 1 C R datasheets. For residual construction moisture, consider the use of
ARDEX MVS 95. Contact the ARDEX Technical Services Department for further information.
PRIMING
ALL SURFACES REQUIRE PRIMING.
It is necessary to thoroughly prime concrete, cement/sand screeds and gypsum based sub-floors with ARDEX P 51 Concentrated Water-Based Primer and Bonding Agent. Consult the ARDEX P 51 data sheet for dilution ratios. As a pore sealer, ARDEX P 51 will maintain the flow life and prevent air bubbles rising through the applied ARDEX K 15 mortar.
ARDEX P 82 Primer and ARDEX P 4 Primer are both recommended for use on very smooth, dense and non-absorbent sub-floors. e.g. ARDEX damp proof membranes and smooth power-floated concrete. Use ARDEX DGR to remove polish, wax, grease, oil and similar contaminating substances prior to use. It is necessary to use all ARDEX Primers strictly in accordance with the relevant product data sheet, to ensure adequate adhesion of the subsequently applied ARDEX K 15.
If ARDEX MVS 95 has been used there is no requirement to prime this surface prior to applying ARDEX K 15.
MIXING
Use 5.25 – 5.5 litres of water per 22kg bag. Add the powder to the required amount of clean water, in a clean mixing container whilst stirring thoroughly, until a lump free mortar is produced.
Use the minimum amount of water for thick applications, or cold conditions.
The use of an ARDEX mixing paddle with a 10mm chuck slow speed (600 – 1,000 r.p.m.) electric drill, makes light work of mixing. Mixed ARDEX K 15 should be applied within 30 minutes at 20°C. This time is extended at lower temperatures and reduced at higher temperatures.
APPLICATION
Pour the mixed ARDEX K 15 onto the prepared sub-floor. The mixed mortar will flow out and self- level above 1.5mm during the first 15 minutes of its 30 minutes working time. Use a suitable steel trowel to obtain the required thickness. A steel finishing float can be used for feather edging and touch up work. Apply at temperatures above 5°C.NOTE: It is recommended that the floorcovering is applied within 48 hours to avoid surface crazing and contamination of the floor. Any longer than 48 hours, the surface should be covered until the floorcovering is laid.
APPLICATIONS OVER UNDERFLOOR HEATING
The cementitious levelling compound should have been laid in accordance with BS 8204 Part 1. The underfloor heating system should have been commissioned in accordance with the manufacturer’s instruction manual and in accordance with BS 8204 Part 1. Once thermally cycled and commissioned, the underfloor heating system should be turned down to 15 degrees centigrade surface temperature before the installation of the ARDEX K 15, smoothing compound and final floor covering. The underfloor heating system should then be gradually re- commissioned to avoid rapid thermal shock and temperature variation.
THICKNESS
ARDEX K 15 can be applied from a very thin coating up to 35mm thick. ARDEX K 15 should be applied at thicknesses greater than 1.5mm to benefit from its self-levelling properties.
NOTE: Non-absorbent sub-floors, e.g. surface damp proof membranes, must be levelled with at least 3mm of the smoothing compound up to a maximum of 6mm thick.
When applying ARDEX K 15 at thicknesses of over 10mm, incorporate up to an equal volume of 3mm ARDEX COARSE AGGREGATE. For thicknesses exceeding 20mm, up to 35mm, up to an equal volume of 3-8mm clean, dry, fines free, graded gravel may be used.
Mix the ARDEX K 15 as above and add the aggregate without the further addition of water.
For thicknesses greater than 7mm, it may be more convenient to use ARDEX K15 HB which has aggregate incorporated. A smoothing layer of ARDEX K 15 may be required on top of the ARDEX K15 HB prior to applying the floorcovering, depending upon the finish achieved and the floor- covering being installed.
NOTE: When smoothing over flooring grade asphalt, or over sub-floors with traces of sound, hard, non-water softenable adhesive residues, use ARDITEX NA.
DRYING AND HARDENING
Receives floorcoverings in as little as 4 hours when a high performance adhesive is used. Rapid hardening can be walked on after 2 hours.
ARDEX K15 COVERAGE
Approximately 1.4kg of ARDEX K 15 per m2 per mm thick. e.g. One 22kg bag will give enough material to cover approx 5.25m2 at 3mm thick. NOTE: The coverage figure is based on a flat level surface. Additional material should be allowed for where the surface is rough or uneven.
PACKAGING
ARDEX K 15 is packed in paper sacks incorporating a polyethylene liner – net weight 22kg.
PRECAUTIONS
ARDEX K 15 is considered non-hazardous in normal usage. The presence of cement in the product gives an alkaline mortar which may cause some local irritation if prolonged contact with the skin takes place. Care should be taken to avoid inhalation or ingestion of dust and prevent contact with the eyes. For further information, consult the relevant Health and Safety Data Sheet.
There are no reviews yet.